Peningkatan Target Produksi Pengupasan Tanah Penutup Pada Penambangan Bijih Nikel CV. Sentosa Abadi Desa Bahomakmur, Kecamatan Bahodopi, Kabupaten Morowali, Provinsi Sulawesi Tengah

Gina Audina P Alhabsyi, Muh Arif Idhan, Ruth Bunga, Hendra Sani

Abstract


Nickel is the fifth most common chemical element on Earth. Several regions in Indonesia with large nickel content are East Luwu, South Sulawesi, Kolaka, Southeast Sulawesi, Morowali, Central Sulawesi, East Halmahera, North Maluku. Most nickel mines use a mining method with an open mining system (Surface Mining) using a method (Open Cut Mining), namely cutting from the ridge downwards. The mining stages are carried out by clearing land, stripping overburden, dredging ore, loading and hauling for purification and processing. CV. Sentosa Abadi is a Mining Contractor based in Palu City, Central Sulawesi and also has a site camp in Bahomakmur Village, Bahodopi District. The company uses an open cut process along with open-pit mining technology. Land clearing, removal of top soil and cover soil. The aim of this research is to determine the overburden production target in July at CV. Sentosa Abadi and to evaluate production increases which are influenced by waiting times. Calculating production targets is one way to plan and control production, apart from that, production targets can also be defined as a tool to carry out effective and efficient planning. From research This is the volume of overburden produced during one month with total production of 296,927.7 bcm.



Keywords


Jam kerja,tanah penutup, target produksi

Full Text:

PDF

References


Isjudarto A, 2013, Pengaruh Morfologi Terhadap Pembentukan Nikel Laterit, Depok.

Rizco, 2021, Studi Efesiensi Biaya Operasi Kegiatan Overburden Removel Pada Pit 1 PT. Jambi Prima Coal”, Jakarta.

Asy´ari, MA. 2012, Regional Lembar Bungku, Bandung.

Simandjuntak, T.O., E. Rusmana & J.B. Supandjono, 1994, Geologi Lembar Bungku, Sulawesi, Pusat Penelitian dan Pengembangan Geologi, Indonesia.

Zaidan Mohammad,Garinas Wahyu, 2021, Kajian Bahan Baku Mineral Nikel untuk Baterai , Banten.

Simandjuntak, T.O., E. Rusmana & J.B. Supandjono, 1994, Geologi Lembar Bungku, Sulawesi, Pusat Penelitian dan Pengembangan Geologi, Indonesia.

Febrianto Valentino Pasae, ST 2020, Analisis Keserasian Alat Muat Dan Alat Angkut Pada Penggalian Dan pengangkutan Bijih Nikel, Makassar.

Chaerul Mochammad,Ananda R. Fajhri, 2020, Study Valuasi Smelter Pengolahan Nikel Melalui Pendekatan Analisis Biaya Manfaat , Bandung.

Hasanah Dillah, 2020, Analisis Perbaikan Delay Time Untuk Meningkatkan Efisiensi Kerja Alat Gali Muat (PC-1250) dan Alat Angkut (HD-465) Pada Kegiatan Pemindahan Tanah Penutup Pada Front Penambangan PT. Artamulia Tata Pratama, Padang.

Rizco, 2021, Studi Efesiensi Biaya Operasi Kegiatan Overburden Removel Pada Pit 1 PT. Jambi Prima Coal”, Jakarta.

Rivai Arifnandi Muhammad & Octova Andre, 2020 “Analisis Optimalisasi Loss Time Alat Gali Muat Untuk Mencapai Target Produksi Overburden di Pit Timur PT. Allied Indo Coal Jaya, Padang.

Andi Tenrisuki tenriajeng, 2003, pemindahan Tanah Mekanis ,Seri Diktat Kuliah.Penerbit Gunadarma.

Doddy Setia Graha, Ir., 1987 Pemuatan Merupakan rangkaian Kegiatan, Bandung.

Jay heizer, barry Render, 2011, managemen Operations, Penerbit Salemba Empat.




DOI: https://doi.org/10.37905/jage.v2i2.23142

Refbacks

  • There are currently no refbacks.




Copyright (c) 2023 Gina Audina P Alhabsyi, Muh. Arif Idhan, Ruth Bunga R, Hendra Sani

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.