Load Flow and Transient Stability Analysis of the Gorontalo 150 kV Electrical System Post-Interconnection of the 10 MWp Isimu Solar Power Plant

Frengki Eka Putra Surusa, Ihksan Ihksan, Steven Humena

Abstract


The Isimu Solar Power Plant (PLTS) has been constructed for the Gorontalo power system. This plant is directly interconnected to the Isimu Substation bus via a 20 kV distribution line. This interconnection alters the system's power flow and impacts its stability. Consequently, an analysis of the main generation system's performance under steady-state conditions—considering system disturbances—was conducted for both pre- and post-interconnection scenarios. The Isimu PLTS interconnection improved the voltage profile at each substation bus by an average of 1.06% and resulted in minimal power losses of 0.43%, thereby enhancing overall system performance. During short-duration disturbances, the Gorontalo power system remained stable; following a disturbance, the generator rotor angle returned to normal operation one second faster than in the pre-interconnection state.


Keywords


Isimu PLTS; Power Flow; Rotor Angle Stability.

Full Text:

PDF

References


John J. Grainger and William D. Stevenson, J. (1994). Power System Analysis. Power System Analysis. Retrieved from http://bank.engzenon.com/download/4f8aebfd-dd9c-4adb-a56c-58fb4ad0ed3b/Power_System_Analysis_John_Grainger_1st.pdf.

PT. PLN (Persero) ULTG Gorontalo, 2019.

PT. PLN (Persero) UP3 Gorontalo, 2019

PT. Quantum Solar Gorontalo, 2019

Zainuddin, M., Sarjiya, Handayani, T. P., Sunanda, W., & Surusa, F. E. P. (2018). Transient Stability Assessment of Large Scale Grid-Connected Photovoltaic on Transmission System. Proceedings - 2018 2nd International Conference on Green Energy and Applications, ICGEA 2018, (March), 113–118.

Suyono, H., & Zainuddin, M. (2015). Injection Impact of Photovoltaic Distributed Generations (PVDG) on Power Distribution System Stability. Applied Mechanic and materials, 403–408.

Frengki, Suyono, Wijono. (2016). Analisis Steady State dan Dinamik pada Perencanaan Pengembangan Pembangkit Sistem Gorontalo. E-JAEI, 9–14.

Zainuddin, M. (2017). Pengaruh Masuknya PLTS on Grid Skala Besar Pada Sistem Distribusi 20 KV Terhadap Kualitas Tegangan dan Rugi-rugi Daya. Prosiding Seminar Nasional FORTEI, (October 2017), 131–136.

Ervan Hasan Harun, ST.,MT dan Taufiq Ismail Yusuf, ST., M. S. (2012). Analisa Aliran Daya pada Sistem Tenaga Listrik 150 kV Gorontalo Menggunakan Metode Newton Raphson.

Hariyadi, S. (2017). Analisa Rugi-rugi daya dan Jatuh Tegangan pada Saluran Transmisi Tegangan Tinggi 150 KV pada Gardu Induk Salur-Masaran Disusun. Universitas Muhammadiyah Surakarta, (1–16).

Muhammad Radil, Riad Syech, S. (2014). Analisis Rugi-rugi Daya pada Saluran Transmisi Tegangan 150 kV dari Gardu Induk Koto Panjang ke Gardu Induk Garuda Sakti Pekan Baru. 1(2), 193–198.

Arismunandar Artono & S. Kuwahara (1993). Tenik Tenaga LIstrik. Jilid II. Pradnya Paramitha. Jakarta.

Dewantara, M. (2018). Analisis rugi-rugi daya pada saluran transmisi tegangan tinggi 150 kv dari gardu induk wonogiri sampai gardu induk wonosari.

E.M Suryanti, Rosmallati, I.B.F. Citarsa (2014). Analisis Unjuk Kerja sistem fotovoltaik On-Grid pada Pembangkit Tenaga Surya (PLTS) Gili Trawangan, Dielektrika, Vol. 1, No. 2, 82-95.

Gultom, T. T. (2015). Pemanfaatan Photovoltaic Sebagai Pembangkit Listrik Tenaga Surya. Jurnal Mudira Indure, 1(3), 33–42.




DOI: https://doi.org/10.37905/jjeee.v8i2.36995

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Published by:
Electrical Engineering Department
Faculty of Engineering
State University of Gorontalo
Jalan B.J.Habibie Desa Moutong Kecamatan Tilongkabila Kabupaten Bone Bolango
Telp. 0435-821175; 081340032063
Email: [email protected]/[email protected]

Creative Commons License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.