| Issue | Title | |
| VOL.1 NO.1, MEI 2021 | Pengukuran dan Analisis Produktivitas Menggunakan Metode Objective Matrix (OMAX) (Studi Kasus: di PDAM Kabupaten Gorontalo) | Abstract PDF |
| Hindun Effendy, Buyung R. Machmoed, Abdul Rasyid | ||
| VOL. 6 NO. 1, MEI 2026 | Pengukuran Efektivitas Mesin Separator Menggunakan Metode Overall Resource Effectiveness (ORE) di PT. X | Abstract PDF |
| Meilani Anggraini, Ahmad Sidiq, Barel Candra Karisma | ||
| VOL. 6 NO. 1, MEI 2026 | PENGUKURAN KINERJA MESIN PRODUKSI MENGGUNAKAN METODE OEE DAN RAMS PADA PT.XYZ | Abstract PDF |
| Dedy Tryono, Stella Junus, Mohamad Riyandi Badu | ||
| VOL. 1 NO. 2, NOVEMBER 2021 | Pengukuran Kinerja Supplier Menggunakan Metode Analitycal Hierarchy Process (AHP) di PT. Harvest Gorontalo Indonesia | Abstract PDF |
| Dwi Noviani, Trifandi Lasalewo, Idham Halid Lahay | ||
| VOL. 4 NO. 2, NOVEMBER 2024 | PENGUKURAN TINGKAT PRODUKTIVITAS BENGKEL XYZ MENGGUNAKAN METODE MARVIN E. MUNDELL | Abstract PDF |
| Riyan iyan Rahman, Nurfaisal Harun, Eduart Wolok | ||
| VOL. 1 NO. 2, NOVEMBER 2021 | Pengukuran Waktu Kerja Karyawan pada Pengemasan Es Kristal Menggunakan Metode Time Study | Abstract PDF |
| Annisa Latief, Putri Famalya Melu, Idham Halid Lahay, H Hasanuddin | ||
| VOL. 6 NO. 1, MEI 2026 | PERANCANGAN ALAT PENEMPA BESI PEMBUATAN PARANG MENGGUNAKAN PENDEKATAN ERGONOMI DAN VALUE ENGINEERING (STUDI KASUS: UKM PANRE BESI) | Abstract PDF |
| Ulfa Turrahmi, Angga Yuda Sakti, Liza Dwi Eftiza Khairunniza, Muhammad Febrian | ||
| VOL. 6 NO. 1, MEI 2026 | PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UMKM ABC MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING | Abstract PDF |
| Fitra Fitra, Della Puspita, Gracesiya Gracesiya, Novita Sari, Siti Najwa Syuhada | ||
| VOL. 6 NO. 1, MEI 2026 | PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UMKM CV XYZ MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING | Abstract PDF |
| Fitra Fitra, Rafiq Ananda, Muhammad Iqbal, Muhammad Arif, Arfiansyah Putra | ||
| VOL.2 NO.1, MEI 2022 | Perawatan Mesin Induced Draft Fan Menggunakan Metode Reliability Centered Maintenance Di PT. Kurnia Luwuk Sejati | Abstract PDF |
| Hasanuddin ., I Wayan Agus Arimbawa, Abdul Rasyid, Sunardi . | ||
| VOL. 5 NO. 2, NOVEMBER 2025 | PERBAIKAN SISTEM TERPADU PENGENDALIAN ASAP PADA PROSES PEMBAKARAN ARANG TEMPURUNG KELAPA | Abstract PDF |
| Yogi Saputra, Muhamad Rizky Pratama Sintae, Prima Al Fatikhah, Zulkifli Zulkifli | ||
| VOL. 2 NO. 2, NOVEMBER 2022 | Perencanaan Kapasitas Produksi Janur Woka di UD. Pulu Bali Menggunakan Metode CRP (Capacity Requirement Planing) | Abstract PDF |
| Stella Junus, Abdul Rasyid, Irwan Wunarlan, I Wayan Ardiana | ||
| VOL. 1 NO. 2, NOVEMBER 2021 | Perencanaan Persediaan Produk Keripik Pisang Dengan Menggunakan Metode Distribution Requirement Planning (DRP) Di UKM Flamboyan Gorontalo | Abstract PDF |
| Wahyudi Pua, Irwan Wunarlan, Hendra Uloli | ||
| VOL. 6 NO. 1, MEI 2026 | PREVALENSI DAN FAKTOR RISIKO ERGONOMIS GANGGUAN MUSKULOSKELETAL PADA PEKERJA PERTANIAN: SYSTEMATIC LITERATURE REVIEW | Abstract PDF |
| Erniyani Erniyani, Famelga Clea Putri, Muhsin. Z, Aqfi Nur Firdaus, Nur Fuadah | ||
| VOL. 6 NO. 1, MEI 2026 | TECHNOLOGY ACCEPTANCE MODEL: ANALISIS INTENSI DAN ADOPSI KENDARAAN LISTRIK PADA CIVITAS AKADEMIKA PERGURUAN TINGGI | Abstract PDF |
| Kurniawan Sigit Wahyudi, I Wayan Adiyasa, Fajrin Sidiq Muzaffarul Zaman | ||
| VOL. 1 NO. 2, NOVEMBER 2021 | Thank You to Our Peer-Reviewers | Abstract Certificate of Service-Nov. 2021 |
| The Editorial Team | ||
| VOL.1 NO.1, MEI 2021 | Thank You to Our Peer-Reviewers | Abstract Certificate of Service-May 2021 |
| Trifandi Lasalewo, Jamal Darusalam Giu | ||
| VOL. 6 NO. 1, MEI 2026 | TINJAUAN LITERATUR SISTEMATIS: PENDEKATAN ERGONOMI MITIGASI KELELAHAN PEKERJA MENUJU INDUSTRI 5.0 | Abstract PDF |
| IRIN RAMDHANI, Raodah Raodah, Erniyani Erniyani, Ismail Aqsha | ||
| 51 - 68 of 68 Items | << < 1 2 3 | |

